Electrification of Sangcharak, Sozmaqala & Gusfandi Districts of Sar-e-Pul Province, Afghanistan

This is a Design-Build / EPC project currently being executed under a contract between the Ministry of Water and Energy (MoWE) and State Corps, covering the electrification of Sangcharak, Sozmaqala, and Gusfandi districts of Afghanistan. The scope includes the construction of a 60 km, 110 kV transmission line from Sar-e Pul to Sangcharak Substation, along with a new 110/20 kV Sangcharak Substation with a capacity of 32 MVA (2x16 MVA). It also includes the construction of a 110 kV line bay at Sar-e Pul Substation for integration into the national grid. In addition, the project involves the development of 20/0.4 kV MV/LV distribution networks with total capacities of 3 MVA in Sangcharak, 18 MVA in Sozmaqala, and 5 MVA in Gusfandi districts.

Project Information

  • Client: MoWE
  • Location: Sare Pul
  • Status: Ongoing
  • Sector: Power and Energy
  • Category: Multi-service

Project Scope

  • Sar-e Pul - Sangcharak Substation (60 km)
  • Overhead 110 kV single-circuit transmission line
  • OPGW communication and protection system installation
  • 110/20 kV Sangcharak Substation (32 MVA, 2x16 MVA)
  • 110 kV line bay at Sar-e Pul Substation
  • 20/0.4 kV MV/LV distribution networks in three districts
  • Distribution capacity: 3 MVA (Sangcharak)
  • Distribution capacity: 18 MVA (Sozmaqala)